I participated in a number of sub-projects and assisted my team in project design and site inspection in these projects as follows:
  • LON 23 – Level 01 Retail & Public Circulation (North)
  • LON 26 & 35 – T5B St. Regis Hotel
  • LON 39 – Level 01 Retail & Public Circulation (South)
  • LON 41- Level 01 to L03 Central Spine
  • Podium – Level B1 to LG Car Park
  •  

    What do i do

    All these projects have a specific project engineer, my role was a part-time helper to assist them in project design and site inspection on the Fire Services (Wet & Dry ) System.

    System I worked for

    Fire and Life Safety Conservation Plan

    Project Design

    Fire and Life Safety Conservation Plan

    FLSCP established two areas, one maintained the shop operation and the other supported the A&A works in the construction area. It provided temporary building services in the shop and pedestrian area, and disabled the existing services in the upcoming construction area.

    Hydraulic Calculation

    I prepared hydraulic calculations to fulfill consultant’s request and review the capacity of the sprinkler pipes.

    Pressurization Duct on Staircase

    Project Management

    Site Inspection

    I participated in the site inspections for final fix and hydraulic test of wet fire system and functional test for dry fire system and its interconnection systems with the consultants and the clients. Then I arranged to rectify the non conformance items, whatever the drawing issues or the site work, to fulfill the demands from the consultants and the clients so as to deliver further the project and made everyone satisfied with our delivery.