SCC GFA Reclamation
The project was for Addition & Alteration (A&A) Works at Level 02 to 03M of Cotai Parcel 5&6, Zone”a”, which involved removal of slab as shown on architectural plan. Wet Fire System was modified correspondingly for the architectural alternations.
What do i do
I was a project engineer, the in-charge person, for the wet fire system under this project. From understanding the clients’ requirements, the regulations and the standards, tackling with a series of paperwork, site supervision and coordination as well as delivering the project; I did everything that falls in between these lines and it can be summarized as two major fields: project design and project management.
System I worked for
- Fire Service (Wet) System
- Automatic Sprinkler System
- Standpipe and Hose Systems
- Fire Extinguisher
Superimposed Plan
Project Design
Design Narrative
I prepared a design narrative and submitted it to the consultants for getting an approval before starting the site work, the narrative described the design parameters of the system and provided the drawing list.
Shop Drawings
I prepared the shop drawings and submitted it to the consultants for getting approval before starting the site work.
Drawing List for Shop Drawings
Project Management
Site Supervision and Coordination
I performed a daily walk on site to monitor the site progress and supervise the workmanship and the safety performance.
In addition, a series of coordination was executed during the site walk, it ensured that the installations were conducted up to the site situation and the latest drawings so as to reduce the non conformance items.
Document Control
As you may know, we have a lot of paperwork during the site construction. It involves many fields such as engineering and construction, safety, environment, quality survey, quality assurance, etc. I handled all of these and you may find the several in the image carousel shown at right.
Material Management
I was responsible for ordering the materials , renting the site equipment and arranging the calibration service. I also coordinated the logistic route and the location of the warehouse with a main contractor in order to make a reliable and convenient pathway for the material delivery and store.